Water Main Repair:
All reports of leaks and water main breaks are investigated by staff as soon as possible. Some water main breaks can leave some residents without water, and can take two to four hours to complete, once the water service is shut off. Service restoration may vary, depending on the severity of the repair.
During this time, a Public Works repair crew is assembled and dispatched to the repair site. Affected businesses and residences will be notified, of the break/leak and that they may have low to no water pressure during the repair time. Once utilities are located, the water main is excavated and repaired. Final restoration of the work site usually takes between two to four weeks from the time the work has been completed. Site restoration is dependent upon the type of restoration required and scheduling work with the other divisions. Winter excavations are usually completed during April and May. Restorations are dependent upon the availability of materials to finish the repairs (e.g., hot asphalt).